- Dakon Construction Ltd. logo image

A PASSION FOR BUILDING

 

Dakon Construction provides excellent quality workmanship, on schedule and at a very competitive price. Each project is given specific attention to minimize disruptions, maintain quality standards and meet desired completion dates. The result is an overall project you will be pleased with.

Victoria Park East golf Club front exterior building

University of Waterloo - EC5 Indigenization Suite

 

March 2023

Waterloo, ON    |    Owner: University of Waterloo

 

Renovating a 3,300 square foot space from an existing data 
center to create a new indigenous relations space for the University 
of Waterloo consisting of reception, gathering areas, lounge, 
meeting room and open / closed office spaces. The new space 
includes many features including multiple wall materials and
finishes, several ceiling structures all incorporated with the 
flooring design and surfaces that were used. Also included in
 this renovation was the supply and install of a new NFPA 
Exhaust Hood complete with it’s own fire suppression system.

 

VIEW PROJECT

Victoria Park East golf Club front exterior building

Harriston Public Library Addition & Renovation

 

June 2012
Harriston, ON    |    Owner: Count of Wellington

 

This project is the construction of a new two and a half storey, 600 square meter addition. It is complete with an extensive interior and exterior renovation and restoration of the existing two and a half storey, 450 square meter historic building. Construction occurred in multiple phases to accommodate the existing occupied library.

 

VIEW PROJECT

Victoria Park East golf Club front exterior building

Westmount Signs - New Building

 

February 2023
Kitchener, ON    |    Owner: Westmount Signs

 

This is an industrial building with a second-floor office. The footprint of the building is 14,962 square feet with 21,367 square feet of gross floor area and this building is 26'3" high. Some key substantial features include EV charging stations, groundwater infiltration gallery, extensive lighting controls and energy efficient HVAC systems.

 

VIEW PROJECT

 

Victoria Park East golf Club front exterior building

David Street Housing Development - Phase 1 & Phase 2

 

May 2013
Kitchener, ON    |    Owner: Kitchener Housing Inc.

 

The David Street Housing Development is the construction of a completely new, wood framed four-storey apartment building which was constructed in two phases. The first phase is 16,200 square feet and includes 18 one-bedroom suites, central storage and laundry facilities. The second phase is 17,600 square feet and includes 21 one-bedroom suites, central storage and a community room with a kitchen.

 

VIEW PROJECT

Victoria Park East golf Club front exterior building

Christopher Childrens Centre Redevelopment (LEED GOLD)

 

October 2010
Cambridge, ON    |    Owner: Region of Waterloo

 

This project is the complete demolition of an existing 6,000 square foot daycare and the construction of a new one storey, 10,200 square foot daycare. The project consists of five classrooms, four children’s washrooms/two adult washrooms, administrative offices, commercial style kitchen, storm water pond, and three separate outdoor playgrounds. The building was mandated to achieve LEED Silver, however, due to exemplary performance the building is currently being registered as LEED Gold.

 

VIEW PROJECT

Victoria Park East golf Club front exterior building

Victoria Park East Golf Club

 

September 2021 - January 2022
Puslinch, ON    |    Owner: Victoria Park East Golf Club

 

This was a 3 phase project. Dakon renovated the existing canopy and and front façade of the building. We also replaced the existing windows, doors and siding.

 

VIEW PROJECT

Victoria Park East golf Club front exterior building

2 Quebec Street - 2nd Floor Renovations

 

April 2023
Guelph, ON    |    Owner: Steeves & Rozema Group

 

This contract involves extensive renovations to the 18,000ft2 
2nd floor of an existing 13 story high building. After clearing 
the existing 2nd floor commercial spaces back down to the 
structural walls, the layout will be reconfigured to accommodate 
14 residential suites, a fitness room, a common lounge, and 4 
storage rooms. The work includes demolition, new partitions, 
new finishes, new windows and new cladding on the 2nd floor, 
as well as full replacement of the mechanical, and electrical systems. 

 

VIEW PROJECT

Victoria Park East golf Club front exterior building

WLU Lucinda House Addition & Renovations

 

March 31, 2021
Waterloo, ON    |    Owner: Wilfrid Laurier University

 

Lucinda House was originally built in 1838 and our project focused on the redevelopment of the two-floor, 2,200 square foot heritage home on Laurier’s Waterloo campus. This project required carefully planning and adaptive construction to build an addition on to the existing heritage building. The new addition features CLT mass timber framing installed by Dakon’s own forces. The enhanced space is part of Laurier’s efforts to eliminate barriers for Indigenous learners and create an environment where indigeneity is part of the core experience of all students, faculty and staff.

 

VIEW PROJECT

Victoria Park East golf Club front exterior building

Pope John Paul II Catholic Elementary School

 

September 2010
Kitchener, ON    |    Owner: Waterloo Catholic District School Board

 

This project includes the construction of a new 50,000 square foot, two storey elementary school. The foundations sit on an engineered structural pad, as this building is located on a previous swamp. A methane control and detection system was built into the facility. Features of the school include an adjoining private daycare facility, 20 classrooms, a double gymnasium with divider curtain and retractable stages, sports fields, all new site work, two storey accessible lift, and concrete deck roof assemblies for future expansion of the second floor.

 

VIEW PROJECT

Victoria Park East golf Club front exterior building

Centre for Cold Regions and Water Science

 

October 2013

Waterloo, ON    |    Owner: Wilfrid Laurier University

 

This project began with demolition of a previous one storey concrete block building at 65 Lodge Street in Waterloo, and the construction of a new two storey, 14,000 square foot science research facility. The project includes special design features to replicate arctic climate and includes tank reservoirs, testing facilities, etc. Mid-way through the installation of the building structure, a decision was made to add a third storey greenhouse to the building. This added the challenges of re-engineering, reinforcing, and design changes to accommodate access and services.

 

VIEW PROJECT

Victoria Park East golf Club front exterior building

Elora Library

 

June 2009
Elora, ON    |    Owner: County of Wellington

 

This project is the renovation and addition to the existing heritage library building. Work included the addition of an elevator and other modifications to provide barrier free accessibility. It was completed using the County of Wellington’s Green Legacy Green Building Standards. This building meets the Emerald level of certification, which is the County’s highest building standard.

 

VIEW PROJECT

Victoria Park East golf Club front exterior building

Waste Water Treatment Plant Administration Building

 

November 2010
Waterloo, ON    |    Owner: Region of Waterloo

 

This project started with the emptying and demolition of two existing digestion tanks to make way for the new construction of the Waterloo Waste Water Treatment Plant Administration Building. The two storey structure is constructed using load bearing masonry and structural steel framing. The foundations are poured concrete on a structural fill pad, up to 20 feet deep. This project was completed with LEED Silver certification.

 

VIEW PROJECT

Victoria Park East golf Club front exterior building

Guelph Saultos Gymnastics Renovation

 

March 1, 2021
Guelph, ON    |    Owner: Guelph Saultos Gymnastics

 

Complete renovation to existing gymnastics club including demolition to open up space, exterior wall demolition for new doors and windows, new block and structural steel walls, exterior asphalt and concrete work, new exterior front canopy, new automatic front sliding doors and windows, flooring, millwork, ceilings, paint, mechanical and electrical revisions. The project featured exterior site work to complete a more accessible entryway.

 

VIEW PROJECT


 

ONLINE

PLANS ROOM

Log in or Create a New Account to View and Download Your Project Plans
Easily update your profile and monitor various projects at your convience

 

GET STARTED NOW

.

GET IN TOUCH

 

CONTACT US